Rottendorf Biebelrieder Cross
A short loud bang and 32 kilograms of explosives brought the so-called Overfly to collapse.
After long preparations on Saturday, 19/02/2011 blown the bridge from the A7, take the A3 in the direction of Nuremberg. 2,500 tons of concrete and steel came to the event and a huge I dust cloud passed over the highway sections on the cross.
task of firefighters from Rottendorf it was within 300 meters around the junction a barrier to form and do not allow people in the inner Shutoff.
With 25 men and three vehicles, the comrades of the Rottendorfer military were responsible for the proper observance of safety distances. Many spectators watched the explosion, although it was not given by all sectors is a direct line of sight. large
Shortly after the blast, the explosives expert after the "construction site" again released, rolled 7 Excavators and various vehicles and set to work, the A to make 3 again. This work lasted until Sunday morning to.
also Kreisbrandrat Heinz Geissler information on site about the events .
0 comments:
Post a Comment